Skoči na glavni sadržaj

Stručni rad

Review of the Feasibility study for the Dubrovnik-Zagreb high speed road

Petar Đukan


Puni tekst: hrvatski pdf 199 Kb

str. 389-393

preuzimanja: 2.094

citiraj


Sažetak

In the response to the "Feasibility study for the Dubrovnik-Zagreb high-speed road", as presented in the issue No. 6/2000, the first comment focuses on the term "high-speed road" which is regarded as something that is not defined in an appropriate manner. The attention is drawn to the inconsistent approach during preparation of the study. It is emphasized that the Study does not prove economic validity of the project. Finally, the author uses an example of three corridors in the Zagreb - Split - Rijeka triangle to shows the way in which the global comparative analysis should be carried out.

Ključne riječi

high-speed road Dubrovnik - Zagreb; study; project; economic validity; comparative analysis; corridors in the Zagreb - Split - Rijeka triangle

Hrčak ID:

13085

URI

https://hrcak.srce.hr/13085

Datum izdavanja:

14.8.2000.

Podaci na drugim jezicima: hrvatski

Posjeta: 3.175 *