Skoči na glavni sadržaj

Stručni rad

Separation of business processes of an infrastructure manager from business processes of a railway undertaking within the scope of traffic and safety rules

Goran Aleksić ; HŽ Infrastruktura d.o.o., Zagreb, Hrvatska


Puni tekst: hrvatski pdf 274 Kb

str. 88-92

preuzimanja: 583

citiraj


Sažetak

In a simple and analytical way, this specialist paper points to insufficient separation of business processes of an infrastructure manager from business processes of a railway undertaking. This insufficient separation is a remnant of the past due to the fact that, until recently, a railway undertaking and an infrastructure manager were a single company. The paper provides a detailed and brief reference to several details arising from rail traffic and signalling regulations, which are not sufficiently harmonized with the current condition in railway traffic and with the TSI pertaining to traffic operations and management. Besides indicating these details, specific and rather simple solutions are proposed with regard to overcoming such unfavourable situations in regulatory traffic and signalling general acts, which could help avoid potential legal disputes in the future between railway undertakings and infrastructure managers.

Ključne riječi

Signalling rules; traffic rules; rule book; law; train; dispatch; brake test; tail disc; automatic block signal; infrastructure manager; railway undertaking

Hrčak ID:

147105

URI

https://hrcak.srce.hr/147105

Datum izdavanja:

30.9.2015.

Podaci na drugim jezicima: hrvatski

Posjeta: 1.203 *