Skoči na glavni sadržaj

Izvorni znanstveni članak

Impact of Real-time Project Control on Capital Project Cost and Schedule Performance

David Grau ; School of Sustainable Engineering and the Built Environment ; Arizona State University; Tempe AZ, USA
Amin Abbaszadegan ; School of Sustainable Engineering and the Built Environment; Arizona State University; Tempe AZ, USA


Puni tekst: engleski pdf 135 Kb

str. 1289-1294

preuzimanja: 1.512

citiraj


Sažetak

This article assesses the combined influence of information integration and automated data analytics on project performance. To this end, retrospective data on 78 completed projects, with a total installed value of $8 billion, was collected. The level of internal and external information integration and automated analytics were used as surrogates of real-time project controls for statistical analyses purposes. Indeed, non-parametric statistical techniques were used to assess the impact of such technologies on cost and schedule performance. Overall, teams with a sophisticated degree of information integration and automated data analytics can control their projects with more reliable information and in a proactive manner so that informed decisions can be timely made on behalf of the project and the organization.

Ključne riječi

Real-time; Project controls; Cost; Schedule; Performance; Project management

Hrčak ID:

149456

URI

https://hrcak.srce.hr/149456

Datum izdavanja:

1.12.2015.

Posjeta: 2.061 *