Tehnički vjesnik, Vol. 24 No. 1, 2017.
Izvorni znanstveni članak
https://doi.org/10.17559/TV-20160222122629
A model of collaborative process planning system (e-CAPP)
Mijodrag Milošević
orcid.org/0000-0002-8950-4867
; University of Novi Sad, Faculty of Technical Sciences, Trg Dositeja Obradovića 6, 21000 Novi Sad, Serbia
Dejan Lukić
orcid.org/0000-0002-1566-282X
; University of Novi Sad, Faculty of Technical Sciences, Trg Dositeja Obradovića 6, 21000 Novi Sad, Serbia
Stevo Borojević
orcid.org/0000-0001-6576-4683
; University of Banja Luka, Faculty of Mechanical Engineering, Vojvode Stepe Stepanovića 71, 78000 Banja Luka, BiH
Goran Šimunović
orcid.org/0000-0002-7159-2627
; Josip Juraj Strossmayer University of Osijek, Mechanical Engineering Faculty in Slavonski Brod, Trg Ivane Brlić Mažuranić 2, 35000 Slavonski Brod, Croatia
Aco Antić
orcid.org/0000-0002-8520-762X
; University of Novi Sad, Faculty of Technical Sciences, Trg Dositeja Obradovića 6, 21000 Novi Sad, Serbia
Sažetak
The current tendency of global competitiveness requires the development of distributed application systems that are used in the product design, the production preparation, as well as directly in the manufacturing processes. In this way, distributed design and production environments created actually exceed traditional physical and time constraints. The application of internet/intranet technologies enables the connection and integration of geographically dislocated designers, experts, systems, resources and services. After analysing new tendencies in planning and preparing the distributed manufacturing, a need to develop a collaborative system in the area of process planning is identified. Activities related to process planning in distributed environments are often realized by applying the extended CAPP system whose knowledge base is increased and improved by the knowledge of geographically dislocated experts. The e-CAPP represents exactly such a collaborative system which can be effectively applied in the area of process planning.
Ključne riječi
CAPP system; collaborative system; distributed manufacturing; e-manufacturing; process planning
Hrčak ID:
174705
URI
Datum izdavanja:
10.2.2017.
Posjeta: 3.254 *