Tehnički vjesnik, Vol. 25 No. 2, 2018.
Izvorni znanstveni članak
https://doi.org/10.17559/TV-20160629224348
Solving the Software Project Scheduling Problem Using Intelligent Water Drops
Broderick Crawford
orcid.org/0000-0001-5500-0188
; Pontificia Universidad Católica de Valparaíso, Avenida Brasil 2950, Valparaíso, Chile
Ricardo Soto
orcid.org/0000-0001-5685-2905
; Pontificia Universidad Católica de Valparaíso, Avenida Brasil 2950, Valparaíso, Chile
Gino Astorga
; Pontificia Universidad Católica de Valparaíso, Avenida Brasil 2950, Valparaíso, Chile / Universidad de Valparaíso, Prat 856, Valparaíso, Chile
Carlos Castro
orcid.org/0000-0003-4149-7730
; Universidad Técnica Federico Santa María, Avenida España 1680, Valparaíso, Chile
Fernando Paredes
; Escuela de Ingeniería Industrial, Universidad Diego Portales, Manuel Rodríguez Sur 415, Santiago, Chile
Sanjay Misra
; Department of Computer and information Science, Covenant University, Nigeria / Atilim University, 06836 – Incek, Ankara Turkey
José-Miguel Rubio
orcid.org/0000-0003-0377-4397
; Universidad Tecnológica de Chile INACAP, Brown Norte 260, Ñuñoa, Chile
Sažetak
Within the category of project scheduling problems, there is a specific problem within the software industry referred to as the software project scheduling problem. The problem consists in the correct allocation of employees to the different tasks that make up a software project, bearing in mind time and cost restraints. To achieve this goal, the present work first uses metaheuristic intelligent water drops illustrating; this is a recent stochastic swarm-based method increasingly used for solving optimization problems. Finally, the results and comparisons with experiments performed with other techniques are presented, demonstrating the solidity of the approach presented.
Ključne riječi
combinational optimization; computational intelligence; intelligent water drops; metaheuristics; software project scheduling problem
Hrčak ID:
199130
URI
Datum izdavanja:
21.4.2018.
Posjeta: 2.304 *