Skoči na glavni sadržaj

Izvorni znanstveni članak

https://doi.org/10.17794/rgn.2019.2.4

INVESTIGATING THE APPLICABILITY OF THE IMPERIALIST COMPETITIVE ALGORITHM IN THE PROBLEM OF ALLOCATING TRUCKS TO AN OPEN PIT MINE

Ali Dabbagh ; Department of Mining Engineering, Isfahan University of Technology, Isfahan 8415683111, Iran
Raheb Bagherpour orcid id orcid.org/0000-0002-7235-9966 ; Department of Mining Engineering, Isfahan University of Technology, Isfahan 8415683111, Iran


Puni tekst: hrvatski pdf 116 Kb

str. 42-42

preuzimanja: 349

citiraj

Puni tekst: engleski pdf 360 Kb

str. 35-42

preuzimanja: 628

citiraj


Sažetak

Due to high transportation costs in open pit mines, various optimization methods have been developed in this field. Using these methods is much simpler in homogeneous fleets than heterogeneous fleets and it is better to use metaheuristic methods in heterogeneous systems. The number of trucks allocated to each loading device in an iron ore mine was determined in this study using the imperialist competitive algorithm, and with the aim of increasing production in a heterogeneous environment. Then, to determine the amount of production according to the distribution functions which relate to the time cycles, the transportation fleet was simulated and the problem was solved. Iron ore production in the simulated model was increased by 4.4% and the waste rock by 4.1%. In this optimization process, there was also better control over the production amount of iron containing the intrusive element, phosphor.

Ključne riječi

open pit mine; loading; haulage; Imperialist Competitive Algorithm; allocation

Hrčak ID:

218178

URI

https://hrcak.srce.hr/218178

Datum izdavanja:

12.3.2019.

Podaci na drugim jezicima: hrvatski

Posjeta: 2.194 *