Skoči na glavni sadržaj

Stručni rad

Flood embankments – calculation according to Eurocode

Tanja Roje-Bonacci orcid id orcid.org/0000-0002-7123-3421 ; Fakultet građevinarstva, arhitekture i geodezije Sveučilišta u Splitu, Split, Hrvatska


Puni tekst: hrvatski pdf 477 Kb

str. 143-150

preuzimanja: 680

citiraj

Puni tekst: engleski pdf 477 Kb

str. 143-150

preuzimanja: 243

citiraj


Sažetak

Flood embankments are geotechnical facilities important for protection of human life and property. Eurocode 7: Geotechnical design - Part 1: General Rules; however, they are insufficiently taken into account. Design engineers are obliged to comply with the guidelines under this regulation, which are included in several EC7/1 chapters and may be confusing the engineers.
The paper attempts to provide help to the engineers in the design and dimensioning of flood embankments according to Eurocod 7.
The EC7 shortcomings with regard to flood protection dikes were noted by the group for the project monitoring – “International Levee Handbook (ILH)“ (CIRIA C731, (2013.). In 2014, they developed the national guidelines for the UK and Ireland – Application of Eurocode 7 to the design of flood embankments” (available on the internet). The text in this paper is not a translation or description of this document.

Ključne riječi

embankment; flood; Eurocode 7; design approach; partial coefficients

Hrčak ID:

223141

URI

https://hrcak.srce.hr/223141

Datum izdavanja:

28.6.2019.

Podaci na drugim jezicima: hrvatski

Posjeta: 2.165 *