Stručni rad
https://doi.org/10.14256/JCE.2710.2019
Experience in the use of FIDIC contracts on rail infrastructure projects
Edvin Bralić
Puni tekst: engleski pdf 293 Kb
str. 987-993
preuzimanja: 792
citiraj
APA 6th Edition
Bralić, E. (2019). Experience in the use of FIDIC contracts on rail infrastructure projects. Građevinar, 71 (11.), 987-993. https://doi.org/10.14256/JCE.2710.2019
MLA 8th Edition
Bralić, Edvin. "Experience in the use of FIDIC contracts on rail infrastructure projects." Građevinar, vol. 71, br. 11., 2019, str. 987-993. https://doi.org/10.14256/JCE.2710.2019. Citirano 25.12.2024.
Chicago 17th Edition
Bralić, Edvin. "Experience in the use of FIDIC contracts on rail infrastructure projects." Građevinar 71, br. 11. (2019): 987-993. https://doi.org/10.14256/JCE.2710.2019
Harvard
Bralić, E. (2019). 'Experience in the use of FIDIC contracts on rail infrastructure projects', Građevinar, 71(11.), str. 987-993. https://doi.org/10.14256/JCE.2710.2019
Vancouver
Bralić E. Experience in the use of FIDIC contracts on rail infrastructure projects. Građevinar [Internet]. 2019 [pristupljeno 25.12.2024.];71(11.):987-993. https://doi.org/10.14256/JCE.2710.2019
IEEE
E. Bralić, "Experience in the use of FIDIC contracts on rail infrastructure projects", Građevinar, vol.71, br. 11., str. 987-993, 2019. [Online]. https://doi.org/10.14256/JCE.2710.2019
Puni tekst: hrvatski pdf 153 Kb
str. 987-993
preuzimanja: 3.658
citiraj
APA 6th Edition
Bralić, E. (2019). Experience in the use of FIDIC contracts on rail infrastructure projects. Građevinar, 71 (11.), 987-993. https://doi.org/10.14256/JCE.2710.2019
MLA 8th Edition
Bralić, Edvin. "Experience in the use of FIDIC contracts on rail infrastructure projects." Građevinar, vol. 71, br. 11., 2019, str. 987-993. https://doi.org/10.14256/JCE.2710.2019. Citirano 25.12.2024.
Chicago 17th Edition
Bralić, Edvin. "Experience in the use of FIDIC contracts on rail infrastructure projects." Građevinar 71, br. 11. (2019): 987-993. https://doi.org/10.14256/JCE.2710.2019
Harvard
Bralić, E. (2019). 'Experience in the use of FIDIC contracts on rail infrastructure projects', Građevinar, 71(11.), str. 987-993. https://doi.org/10.14256/JCE.2710.2019
Vancouver
Bralić E. Experience in the use of FIDIC contracts on rail infrastructure projects. Građevinar [Internet]. 2019 [pristupljeno 25.12.2024.];71(11.):987-993. https://doi.org/10.14256/JCE.2710.2019
IEEE
E. Bralić, "Experience in the use of FIDIC contracts on rail infrastructure projects", Građevinar, vol.71, br. 11., str. 987-993, 2019. [Online]. https://doi.org/10.14256/JCE.2710.2019
Sažetak
The use of FIDIC general conditions of contract in the realisation of rail infrastructure construction works is presented in the paper. Contract limitations are analyzed such as: minimum amount of interim certificates, advance payment, scheduling repayment of advance payment, guarantees and retention money, work contract procurement according to FIDIC Red Book, conditions of contract for works designed by the Employer without construction documents at the time of procurement, realisation of work under traffic, preliminary work, railway track closure, problems relating to interim certificates for additional work, and contract procedures.
Ključne riječi
FIDIC contracts; minimum amount of interim certificate; advance payment; guarantees; retention money; additional work
Hrčak ID:
227745
URI
https://hrcak.srce.hr/227745
Datum izdavanja:
11.11.2019.
Podaci na drugim jezicima:
hrvatski
Posjeta: 5.619
*