Geodetski list, Vol. 62 (85) No. 1, 2008.
Stručni rad
Stability of the Krško Nuclear Power Plant
Simona Savšek-Safić
; Fakulteta za gradbeništvo in geodezijo, Univerza v Ljubljani, Ljubljana, Slovenija
Klemen Skube
; IBE d.d., Ljubljana, Slovenija
Matej Tacer
; Frotier Surveying, Fort Worth, TX, ZDA
Tomaž Ambrožič
; Fakulteta za gradbeništvo in geodezijo, Univerza v Ljubljani, Ljubljana, Slovenija
Sažetak
The Krško Nuclear Power Plant (NEK) is of strategic importance for the Republic of Slovenia, producing electricity for users in Slovenia and Croatia. It generates over five billion kWh of electrical energy per year, which represents approximately 40% of the total electricity produced in Slovenia and approximately 17% in Croatia. The high level of security in NEK is of high importance; therefore a comprehensive supervision of structures is carried out. A special attention is given to the security systems, including the measurements of vertical displacements of benchmarks and measurements of horizontal displacements of the dam on the Sava River. Periodic geodetic observations are carried out on important technological structures comprising the nuclear island, the Sava River dam and the nuclear waste storage. The article aims at representing the results of geodetic observations for determination of stability and operational security of this important structure.
Ključne riječi
nuclear power plant; electricity; nuclear safety; security systems; geodetic technical observations; benchmarks; control points; vertical and horizontal displacements; stability
Hrčak ID:
23069
URI
Datum izdavanja:
15.3.2008.
Posjeta: 5.511 *