Skoči na glavni sadržaj

Izvorni znanstveni članak

https://doi.org/10.17559/TV-20210410091404

Risk Management of Road Engineering Project Based on Analytic Hierarchy Process

Shanxiang Chen ; School of Traffic and Transportation Engineering, Changsha University of Science and Technology, Changsha Hunan, China
Xu Luo* ; School of Mechanics and Construction Engineering, Jinan University, 601 Huangpu Avenue West, Guangzhou, China
Xinping Li ; School of Civil Engineering and Transportation, South China University of Technology, Guangzhou, China
Xinsha Fu ; School of Civil Engineering and Transportation, South China University of Technology, Guangzhou, China


Puni tekst: engleski pdf 407 Kb

str. 363-368

preuzimanja: 666

citiraj


Sažetak

In the construction process of road engineering, risks are everywhere. To do a good job in the risk management of road engineering projects, finding the risk factors of road engineering projects is an important part of it. This article introduces the characteristics of project risks and the process of risk management. The AHP method is applied to the risk analysis of road engineering projects to realize the ranking of risk factors, the evaluation of the total risk system, and the selection of risk response measures. This article conducts risk evaluation on the project, finds out important risk factors, and effectively controls them. This paper adopts the analytic hierarchy process on the overall risk management of road engineering projects. Finally, it comprehensively considers the systemic and non-systematic risks faced by road engineering, and specifically involves macro policy and economic risks, as well as project initiation and project construction. The risks and capital risks, and other links considered the internal and external factors of the road-engineering project. In this way, the project risk has been comprehensively measured by a combination of qualitative and quantitative methods, and the effective management of the project has been finally realized.

Ključne riječi

Analytic Hierarchy Process; risk factors; risk management; road engineering

Hrčak ID:

272467

URI

https://hrcak.srce.hr/272467

Datum izdavanja:

15.4.2022.

Posjeta: 1.576 *