Skoči na glavni sadržaj

Prethodno priopćenje

The impact of lean manufacturing on the number of failures in a metal industry production plant – case study

Sz. Pawlak ; Silesian University of Technology, Faculty of Materials Sience, Katowice, Poland *

* Dopisni autor.


Puni tekst: engleski pdf 193 Kb

str. 290-292

preuzimanja: 376

citiraj


Sažetak

The article presents the results of an analysis of the impact of selected Lean Manufacturing tools on the number of failures occurring on the example of a production plant from the metal industry, specializing in the production of welded pipes. Reducing the failure rate of individual devices on the production line is one of the key factors determining the efficiency of the production process and the quality of the manufactured product. In order to reduce unplanned machine downtime caused by failures, various techniques are introduced to reduce them, for example TPM (Total Productive Maintanance). The purpose of this article is to conduct a statistical analysis to assess the impact of TPM implementation on the number of reported failures on one of the production lines.

Ključne riječi

seamed pipes; failure; statistical analysis; Lean manufacturing; total productive maintance

Hrčak ID:

312351

URI

https://hrcak.srce.hr/312351

Datum izdavanja:

1.4.2024.

Posjeta: 923 *