Skoči na glavni sadržaj

Izvorni znanstveni članak

https://doi.org/10.31803/tg-20240829131515

The Impact of Design Team Characteristics on Construction Project Performance with the Mediating Role of Construction Project Costs

Parisa Khorashadi Moghaddam ; Industrial Management, Tagliatela College of Engineering, University of New Haven, 300 Boston Post Rd, West Haven, CT 06516, USA *
Nasrin Izadian ; A. Gary Anderson Graduate School of Management, University of California, 900 University Ave, Riverside, CA 92521, USA
Mehdi Haghighatjoo ; Civil and Environmental Engineering (CEE) Department, Syracuse University, 0151 Link Hall, Syracuse, NY 13244, USA
Amirhossein Moghaddas Jafari ; Department of Civil and Environmental Engineering, University of Waterloo, 200 University Avenue West, Waterloo, ON, Canada N2L 3G1
Marzieh Zahedi ; Department of Urban Design, School of Architecture and Environmental Design, Iran University of Science and Technology (IUST), Narmak, Tehran 16846-13114, Iran

* Dopisni autor.


Puni tekst: engleski pdf 784 Kb

str. 236-242

preuzimanja: 0

citiraj


Sažetak

The aim of this research was to examine the impact of design team characteristics on construction project performance with the mediating role of construction project costs. A total of 212 project managers from construction projects participated in the study. Data were collected using a questionnaire and analyzed by PLS-SEM using SMARTPLS3 software. The results indicated that design team characteristics significantly and positively influence the performance of construction projects. Design team characteristics also have a significant and negative impact on construction project costs. The effect of construction project costs on construction project performance was found to be negative and significant. Furthermore, the mediating role of construction project costs in the relationship between design team characteristics and construction project performance was positive and significant. As a result, it can be inferred that the characteristics of the design team in construction projects lead to improved performance of these projects by reducing construction project costs.

Ključne riječi

construction project costs; construction project performance; design team characteristics

Hrčak ID:

329904

URI

https://hrcak.srce.hr/329904

Datum izdavanja:

14.6.2025.

Posjeta: 0 *