Skip to the main content

Professional paper

https://doi.org/10.17559/TV-20140408131132

Dreniranje terena u zoni klizišta na Dunavskoj padini u Novom Sadu

Milinko Vasić ; University of Novi Sad, Faculty of Technical Sciences, Department of Civil Engineering, Trg Dositeja Obradovića 6, 21000 Novi Sad, Serbia
Mitar Djogo ; University of Novi Sad, Faculty of Technical Sciences, Department of Civil Engineering, Trg Dositeja Obradovića 6, 21000 Novi Sad, Serbia
Branko Jelisavac ; The Highway Institute, Kumodraška 257, 11000 Belgrade, Serbia


Full text: english pdf 2.086 Kb

page 1075-1083

downloads: 644

cite

Full text: croatian pdf 2.086 Kb

page 1075-1083

downloads: 447

cite


Abstract

Klizište u zoni mosta Slobode u Novom Sadu je jedno od najviše istraživanih klizišta u Srbiji iz razloga što predstavlja ozbiljnu prijetnju po stabilnost pomenutog mosta preko Dunava. U vrijeme završetka izgradnje 1981. godine, ovaj most s kosim kablovima, bio je na svijetu s najvećim središnjim rasponom od 351 m. U tijelu klizišta, most je temeljen na armiranobetonskim pilotima duljine 27 m. Utvrđena dubina pomicanja za prvi klizni blok iznosi 26 m, a za drugi 35 m. Projektirani drenažni sustav se sastoji od slijedećeg: dva bunara s promjerom od 6,5 m i dubine 22 m, osam drenova duljine do 45 m i drenažnog tunela koji spaja potisnu komoru i bunare.

Keywords

drenaže; klizište; nadzor

Hrčak ID:

143164

URI

https://hrcak.srce.hr/143164

Publication date:

8.8.2015.

Article data in other languages: english

Visits: 2.418 *