Skip to the main content

Original scientific paper

https://doi.org/10.13044/j.sdewes.d5.0186

Techno-Economic Analysis of Common Work of Wind and Combined Cycle Gas Turbine Power Plant by Offering Continuous Level of Power to Electricity Market

Željko Tomšić orcid id orcid.org/0000-0002-4948-964X ; Department of Energy and Power Systems, Faculty of Electrical Engineering and Computing, University of Zagreb, Unska 3, 10000 Zagreb, Croatia
Ivan Rajšl ; Department of Energy and Power Systems, Faculty of Electrical Engineering and Computing, University of Zagreb, Unska 3, 10000 Zagreb, Croatia
Matea Filipović ; Department of Energy and Power Systems, Faculty of Electrical Engineering and Computing, University of Zagreb, Unska 3, 10000 Zagreb, Croatia


Full text: english pdf 1.243 Kb

page 276-290

downloads: 756

cite


Abstract

Wind power varies over time and variations occur on all time scales, mainly under the influence of meteorological fluctuations. Understanding these variations and their predictability is of key importance for integration and optimal utilisation of wind in the
power system. There are two major attributes of variable renewable generation that notably impact the participation on power exchanges: variability and uncertainty. Due to variability and uncertainty, wind plants cannot participate in the electricity market, especially on the power exchanges. This paper will present a techno-economic analysis
of work of wind plants together with a combined cycle gas turbine power plant as support for offering continuous power to the electricity market. This work presents a model of electricity production from wind farms and a combined cycle gas turbine power plant developed in the programming tool called PLEXOS. Real hourly input data and all
characteristics of combined cycle gas turbine power plant were used in the model. A detailed analysis of techno-economic characteristics of ramp rates and different types of starts and stops of the plant was made. The main motivation for this analysis is to investigate both technical and economical possibilities for an investor to participate in the power exchanges by offering continuous guaranteed power from wind plants by backing them up with a combined cycle gas turbine power plant.

Keywords

Combined cycle gas turbine plant; Wind plant; Wind power balancing; PLEXOS model; Power plant ramp rate; Power plant start-up regime; Optimisation time resolution