Skip to the main content

Original scientific paper

Acceleration of LV winding resistance measurement

Edis OSMANBASIC
Kerim OBARCANIN


Full text: english pdf 641 Kb

page 98-102

downloads: 903

cite


Abstract

The winding resistance measurement requires extended time. According to IEC 60076-1 and IEEE C57.12.90 standards, the test should be performed using DC test current on all phases of the high voltage, low voltage, and tertiary sides, and for all tap positions. Speeding up this measurement is very attractive. This paper presents two approaches to transformer saturation: increasing the test current, and a special connection of the windings to increase the number of turns. The presented case study shows the difference between the regular test procedure and a modified one.

Keywords

transformer testing; winding resistance measurement; transformer saturation; test current; resistance stabilization

Hrčak ID:

207738

URI

https://hrcak.srce.hr/207738

Publication date:

6.7.2018.

Visits: 1.452 *