Skip to the main content

Review article

https://doi.org/10.14256/JCE.2205.2017

Impact of funding on cost-time aspects of public and social buildings

Ksenija Tijanić orcid id orcid.org/0000-0002-3633-2256 ; University of Rijeka, Faculty of Civil Engineering
Diana Car-Pušić orcid id orcid.org/0000-0003-2555-335X ; University of Rijeka, Faculty of Civil Engineering
Ksenija Čulo orcid id orcid.org/0000-0002-1428-4185 ; University J.J. Strossmayer in Osijek, Faculty of Civil Engineering Osijek


Full text: croatian pdf 814 Kb

page 21-32

downloads: 377

cite

Full text: english pdf 289 Kb

page 21-32

downloads: 195

cite


Abstract

The comparison of the traditional (budget-funded) public building procurement model with the public private partnership (non-budget funded) model is presented in the paper. Public service buildings procured based on the traditional model and those procured according to the PPP model are compared in the scope of research involving nine buildings realized in the Republic of Croatia. The results point to greater efficiency of the PPP model in the construction of public service buildings, with regard to both cost and time of construction work.

Keywords

traditional procurement model; PPP; public service buildings; costs; construction time

Hrčak ID:

216929

URI

https://hrcak.srce.hr/216929

Publication date:

7.2.2019.

Article data in other languages: croatian

Visits: 1.479 *