Completion Deadline, Price Difference & Defamation within

Mirko Orešković


Full text: croatian pdf 600 Kb

page 259-269

downloads: 132

cite

Full text: english pdf 609 Kb

page 259-269

downloads: 216

cite


Abstract

This paper takes a critical look at two terms; one is Completion Deadline (CD) and the other is Price Difference (PD). These two terms will not be approached semantically or, more generally, lexically, but solely through their use value, their widespread applicability and the ambiguities of their use, depending on the angle from which they are viewed, applied, and interpreted, each in its own right. More than often, there is an exclusive approach that does not accept the possibility of a different understanding, comprehension, or interpretation. This is what this work is about, polemically, all centered on the success of the construction project.

Keywords

construction project; completion deadline; price difference; currency value of the service; engineering consulting service

Hrčak ID:

330337

URI

https://hrcak.srce.hr/330337

Publication date:

15.4.2025.

Article data in other languages: croatian

Visits: 737 *