Skip to the main content

Professional paper

Capacity planning in operations producing heavy plate cut shapes

R. Lenort ; VŠB – Technical University of Ostrava, Faculty of Metallurgy and Materials Engineering, Ostrava, Czech Republic
D. Staš ; VŠB – Technical University of Ostrava, Faculty of Metallurgy and Materials Engineering, Ostrava, Czech Republic
A. Samolejová ; VŠB – Technical University of Ostrava, Faculty of Metallurgy and Materials Engineering, Ostrava, Czech Republic


Full text: english pdf 84 Kb

page 209-211

downloads: 695

cite


Abstract

The present approach to capacity planning in operations producing heavy metal shapes causes problems in fulfilling the required financial and volume indexes in production, as well as in meeting the work order completion dates. The article represents the methodology for optimal production scheduling in operations producing heavy plate cut shapes, which significantly eliminates the above-mentioned problems. The methodology is based on the application Generalized Assignment Problem (GAP).

Keywords

capacity planning; production of heavy plate cut shapes; production scheduling; optimization; Generalized Assignment Problem (GAP)

Hrčak ID:

35479

URI

https://hrcak.srce.hr/35479

Publication date:

1.7.2009.

Article data in other languages: croatian

Visits: 1.906 *