Skip to the main content

Preliminary communication

https://doi.org/10.14256/JCE.714.2012

S-curve modelling in early phases of construction projects

Nives Ostojić-Škomrlj ; Sveučilište u Splitu, Fakultet građevinarstva, arhitekture i geodezije
Mladen Radujković ; Sveučilište u Zagrebu, Građevinski fakultet


Full text: croatian pdf 1.145 Kb

page 647-654

downloads: 2.848

cite

Full text: english pdf 1.170 Kb

page 674-654

downloads: 29.799

cite


Abstract

The methodological procedure for forecasting cost distribution over time is given for the project realization phase using cost s-curves for three different types of structures: building, tunnel, and motorway. Three different approaches are used, and their results are correlated and presented in form of mathematical regression expressions and appropriate diagrams. The proposed methodology can be used for cash flow forecasting during all phases of construction projects, specially in the earliest phase in which detailed information about the project is scarce.

Keywords

construction planning; building engineering; tunnels; motorways; S-curve; regression models; cost scheduling

Hrčak ID:

86395

URI

https://hrcak.srce.hr/86395

Publication date:

14.9.2012.

Article data in other languages: croatian

Visits: 33.885 *