Građevinar, Vol. 58 No. 07., 2006.
Preliminary communication
Models for rapid evaluation of a sustainable construction time
Diana Car-Pušić
Mladen Radujković
Abstract
Development of models for rapid evaluation of construction time is analyzed, and possibilities are studied for the development and use of the initial model suitable for use in Croatia. Main properties of the most significant models are presented, including comparative analyses and evaluation of practical usability. The authors present results obtained by the study conducted in Croatia in 2003/05, in which expressions are proposed for calculating sustainable construction times for several groups of buildings. An example from the sphere of building construction is given.
Keywords
sustainable construction time; construction price; rapid evaluation; models; comparative analysis; practical usability
Hrčak ID:
6928
URI
Publication date:
14.8.2006.
Visits: 1.722 *