Skip to the main content

Professional paper

Fabrication and installation of main girders on road structures

Snježana Tešović
Božana Ojvan


Full text: croatian pdf 606 Kb

page 87-90

downloads: 1.568

cite


Abstract

The method used for the fabrication and installation of main girders on road and motorway structures is described. The fabrication of girders in the plant located behind a bridge or viaduct abutment is presented. Reinforcement cages with cables and anchors attached to the front formwork are assembled on a separate platform. An appropriate crane is used to insert cages into the mold. In addition to fabrication technology, the authors also describe installation onto the bridge or viaduct which is performed either by the truck crane or by means of an ASPREM launching truss.

Keywords

main girder; formwork; mold; truck crane; tower crane; reinforcement cage; cable

Hrčak ID:

10173

URI

https://hrcak.srce.hr/10173

Publication date:

15.3.2004.

Article data in other languages: croatian

Visits: 2.196 *