Stjepan Bezak


Full text: croatian pdf 178 Kb

page 457-461

downloads: 13.473

cite


Abstract

The methodological approach for the determination of the price change coefficient for construction work, legally permitted for work performed within the contract time, is described in the paper. The structure of construction works is presented based on the model of standard calculation of construction works. The equation for the calculation of this coefficient is presented and analyzed in the scope of the method for price change coefficient determination. The implementation of the method is illustrated by an appropriate case study.

Keywords

construction works; price; price structure; price change; price change coefficient; program package SKGA