Skip to the main content

Preliminary communication

https://doi.org/10.14256/JCE.1048.2014

Application of particle swarms for project time-cost optimization

Nataša Praščević
Živojin Praščević


Full text: english pdf 390 Kb

page 1097-1107

downloads: 818

cite

Full text: croatian pdf 399 Kb

page 1097-1107

downloads: 1.039

cite


Abstract

The time-cost optimization of a construction project, as related to the costs of its activities and the total project realization costs, is considered in this paper. Direct and indirect costs, durations of all activities, project realization time, and relations between activities, are taken into account. The particle swarm optimisation method is applied for solving this nonlinear problem. The authors adjusted this method for the time-cost optimization, and developed for that purpose an appropriate computer programme in the scope of the MATLAB programming system.

Keywords

project management; project planning methods; time-cost optimization of projects; particle swarm optimisation

Hrčak ID:

132904

URI

https://hrcak.srce.hr/132904

Publication date:

12.1.2015.

Article data in other languages: croatian

Visits: 2.839 *