Professional paper
PROBLEMS IN THE TUBING/PACKER SYSTEM
Davorin Matanović
Mario Livaja
Abstract
When gas and oil wells are completed and produced or treated through the tubing connected to packer, there is a great number of problems to be solved. Changes in temperatures and pressures that occure during various operations ussually result in changes in tubing lengths or tubing to packer forces, depending on tubing to packer connections. This paper summarises some earlier papers and explains partly elaborated details. It also gives a complete approach to solve problems in uniform strings regardless to tubing and packer connections.
Keywords
tubing; packer; forces; movements; stresses
Hrčak ID:
14570
URI
Publication date:
4.12.1993.
Visits: 1.648 *