Skip to the main content

Original scientific paper

https://doi.org/10.17559/TV-20150914110215

A split task solution for quay crane scheduling problem in mid-size container terminals

Neven Grubišić orcid id orcid.org/0000-0002-8540-5634 ; Department of Maritime Transportation, Faculty of Maritime Studies, University of Rijeka, Studentska 2, HR-51000 Rijeka, Croatia
Čedomir Dundović ; Department of Maritime Transportation, Faculty of Maritime Studies, University of Rijeka, Studentska 2, HR-51000 Rijeka, Croatia
Srdjan Žuškin ; Nautical department, Faculty of Maritime Studies, University of Rijeka, Studentska 2, HR-51000 Rijeka, Croatia


Full text: croatian pdf 1.124 Kb

page 1723-1730

downloads: 462

cite

Full text: english pdf 1.124 Kb

page 1723-1730

downloads: 283

cite


Abstract

A solution for quay crane scheduling problem with unchanged number of cranes during container vessel handling process is explored to minimize a vessel handling time and optimize quay crane utilization. Targets are small and mid-size terminals where high reliability of forecasted scenario is requested by the shipping companies while, at the same time, terminal resources are limited. Two models for the problem solution are proposed based on the full task and split task algorithms; in both cases grouping of tasks into clusters and operation zone limits are considered. Comparison of two models shows that split-task algorithm may improve crane utilization rate and vessel handling time in many cases. Proposed solutions combine existing research achievements with authors own approach in container terminal optimization development.

Keywords

container ports; container terminal logistics; container terminal optimization; quay crane schedule; split task algorithm; tactical logistic problems