Skip to the main content

Professional paper

Hydrological measurements in Crveno Jezero (Red Lake) in the period from 28 September 2013 to 10 September 2015

Ivo Andrić ; Faculty of Civil Engineering, Architecture and Geodesy, University of Split, Split, Croatia
Ognjen Bonacci ; Faculty of Civil Engineering, Architecture and Geodesy, University of Split, Split, Croatia
Branimir Jukić ; PD Imotski, Croatia


Full text: croatian pdf 2.278 Kb

page 253-258

downloads: 513

cite


Abstract

The paper analyses the results of hydrological measurements carried out in Crveno Jezero at Imotski in the period from 28 September 2013 (11 pm) to 10 September 2015. In this time period, the following parameters were continuously measured (every hour): (1) water levels, (2) water temperature and (3) electrical conductivity. The measurements were performed by using a CTD DIVER (Schlumberger Water Services). The instrument was posi¬tioned at 212.60 m a.s.l. to facilitate continuous measurements in one point. The resulting measurements described in the paper present the first systemic, continuous monitoring conducted in this world-known karst phenomenon. The paper determines the values related to the changes in Crveno Jezero water volumes and compares them with the measurements of the same parameters in Modro Jezero (Blue Lake).

Keywords

karst hydrology; water levels; water temperature; electrical conductivity; Crveno Jezero (Red Lake) at Imotski in Croatia

Hrčak ID:

192554

URI

https://hrcak.srce.hr/192554

Publication date:

27.12.2017.

Article data in other languages: croatian

Visits: 1.195 *