Skip to the main content

Professional paper

Flood embankments – calculation according to Eurocode

Tanja Roje-Bonacci orcid id orcid.org/0000-0002-7123-3421 ; Faculty of Civil Engineering, Architecture and Geodesy, University of Split, Split, Croatia


Full text: croatian pdf 477 Kb

page 143-150

downloads: 680

cite

Full text: english pdf 477 Kb

page 143-150

downloads: 243

cite


Abstract

Flood embankments are geotechnical facilities important for protection of human life and property. Eurocode 7: Geotechnical design - Part 1: General Rules; however, they are insufficiently taken into account. Design engineers are obliged to comply with the guidelines under this regulation, which are included in several EC7/1 chapters and may be confusing the engineers.
The paper attempts to provide help to the engineers in the design and dimensioning of flood embankments according to Eurocod 7.
The EC7 shortcomings with regard to flood protection dikes were noted by the group for the project monitoring – “International Levee Handbook (ILH)“ (CIRIA C731, (2013.). In 2014, they developed the national guidelines for the UK and Ireland – Application of Eurocode 7 to the design of flood embankments” (available on the internet). The text in this paper is not a translation or description of this document.

Keywords

embankment; flood; Eurocode 7; design approach; partial coefficients

Hrčak ID:

223141

URI

https://hrcak.srce.hr/223141

Publication date:

28.6.2019.

Article data in other languages: croatian

Visits: 2.165 *