Skip to the main content

Original scientific paper

Mapping transformer populations: A key to optimize maintenance processes in order to minimize risks and costs

Georg Daemisch ; Polywater


Full text: english pdf 913 Kb

page 98-104

downloads: 284

cite


Abstract

This article introduces a model for mapping transformer populations. The concept of mapping goes beyond a transformer condition assess- ment to include the financial risk of power disruption and downtime. Different power plant types or industrial production facilities can experi- ence significant cost increase due to production downtimes from the loss of all or a part of the transformer population. Even a single day or a few hours of lost power can have a severe economic impact depending on the function of the transformer(s). The mapping process must be modi- fied to account for these differences.

Keywords

mapping; key assets; aging condition; power transformers

Hrčak ID:

232082

URI

https://hrcak.srce.hr/232082

Publication date:

8.1.2020.

Visits: 887 *