Skip to the main content

Original scientific paper

https://doi.org/10.13044/j.sdewes.d7.0299

Study on Impacts of Multiple Centralised Water Reuse Header fromConsumer and Operator Perspectives

Ahmad F. Ahmad Fadzil ; Process Systems Engineering Centre, Research Institute of Sustainable Environment, Universiti Teknologi Malaysia, 81310 UTM Johor Bahru, Malaysia
Sharifah R. Wan Alwi orcid id orcid.org/0000-0003-4059-1856 ; Process Systems Engineering Centre, Research Institute of Sustainable Environment, Universiti Teknologi Malaysia, 81310 UTM Johor Bahru, Malaysia
Zainuddin Abdul Manan ; Process Systems Engineering Centre, Research Institute of Sustainable Environment, Universiti Teknologi Malaysia, 81310 UTM Johor Bahru, Malaysia
Jiří J. Klemeš ; Sustainable Process Integration Laboratory, NETME Centre, Faculty of Mechanical Engineering, Brno University of Technology, Technická 2896/2, 616 69 Brno, Czech Republic


Full text: english pdf 806 Kb

page 754-765

downloads: 428

cite


Abstract

Total Site Centralised Water Integration is an innovative system of reusing water among industries at an industrial site through the use of a Centralised Water Reuse Header. This allows industries along the Centralised Water Reuse Header to exchange water while the systems are managed and operated by a third-party. However, the suitable
number of Centralised Water Reuse Header and the optimum range concentration are key factors yet to be considered. This paper presents a methodology to determine the optimum number as well as the optimum range of Centralised Water Reuse Header concentration. The approach is illustrated using a case study to demonstrate how different numbers of Centralised Water Reuse Header affects both the total savings enjoyed by consumers and the payback period for the operator’s investment for the system. Results of the study show that two units of Centralised Water Reuse Header offer operator of the system a payback period of 3.5 years with consumer benefitting a 50.9% of total cost savings on freshwater (76.8% reduction) and wastewater (89.6% reduction).

Keywords

Process integration; Pinch analysis; Water minimisation; Total site centralised water integration; Interplant water integration; Centralised water reuse header.