Original scientific paper
https://doi.org/10.17794/rgn.2021.2.7
SIMULACIJA DOSTUPNOSTI I ANALIZA RADA OKLOPNOGA TRANSPORTERA U ŠIROKOČELNOME RUDARENJU
Raziye Norouzi Masir
; Faculty of Mining, Petroleum and Geophysics Engineering, Shahrood University of Technology, Shahrood, Iran
Mohammad Ataei
; Faculty of Mining, Petroleum and Geophysics Engineering, Shahrood University of Technology, Shahrood, Iran
Farhang Sereshki
; Faculty of Mining, Petroleum and Geophysics Engineering, Shahrood University of Technology, Shahrood, Iran
Ali Nouri Qarahasanlou
; Faculty of Technical & Engineering, Imam Khomeini International University, Qazvin, Iran
Abstract
Sustavi proizvodnje ugljena u rudnicima vrlo su složeni, stoga je i popravak opreme skup. Kvar sustava uzrokovat će smetnje kao što je nedostupna oprema, smanjeno vrijeme rada, povećani troškovi proizvodnje i smanjene performanse opreme. Stoga je nužno da se dostupnost industrije ugljena razmatra više nego ikad. U tu svrhu 29 mjeseci prikupljani su podatci o kvaru stroja tipa oklopljenoga širokočelnoga transportera iz rudnika ugljena Tabas. Izračunane su opisna statistika, trendovi i test serijske korelacije podataka. Zatim su simulirane srednje vrijednosti i dostupnost bodova u sustavu. Na temelju rezultata prosječna dostupnost (svi događaji) i dostupnost točke (svi događaji) na 360 000 h iznose 96 % odnosno 95 %. Prosječno je vrijeme do prvoga kvara (MTTFF) transportnog stroja oko 23,61 h. U trima metričkim vrijednostima, ReliaSoft indeksu kritičnosti kvara, ReliaSoft indeksu kritičnosti pada sustava i ReliaSoft indeksu kritičnosti zastoja, električno opremanje ima najveći učinak, dok je glavni pogonski podsustav najmanje važan. Utvrđeno je da analiza dostupnosti kontrolira upravljanje operacijama i poboljšanja u kvaliteti, učinkovitosti i izvedbi linije.
Keywords
Oklopljeni širokočelni transporter; pouzdanost; održivost; simulacija dostupnosti
Hrčak ID:
254160
URI
Publication date:
21.3.2021.
Visits: 1.662 *