Skip to the main content

Original scientific paper

Trial Work of the Long Way in Thin Lignite Layer

Jerko Nuić
Stjepan Prokopović


Full text: croatian pdf 1.153 Kb

page 129-133

downloads: 636

cite


Abstract

Trial excavation road head in the lignite seam was carried out by the application of semimechanized operation with coal seam undercutting. After 6 months of trial work no production effects were attained, so the trial mining field was liquidated and any further trials were given up.
The experiences from the first road head work in concrete and complex mining conditions are considerable. They indicate the possibility of application of the complex mechanization with the lightest equipment if its price and the coal competitiveness will allow and adjust it.

Keywords

Long way; Lignite layer; Semimechanized operation; Undercutting

Hrčak ID:

24661

URI

https://hrcak.srce.hr/24661

Publication date:

4.12.1989.

Article data in other languages: croatian

Visits: 1.283 *