MULTIPHASE BLASTING OF THE BRIDGE ACROSS THE DRENICA RIVER

Branko Božić


Full text: croatian pdf 931 Kb

page 191-195

downloads: 994

cite


Abstract

The construction of new bridges on the sites of the existing ones require demolition of the old bridge. Due to closeness of newly erected bridge elements the fundations of old bridges are demolished by multiphase blasting process. The blasting of the piers and anchorages of the bridge across 'the Drenica river carrying the Balačevac—Goleš industrial railway was done in four phases. The piers and anchorages of a new bridge and its construction elements have been erected before.

Keywords

Bridge; Blasting phases; Protection