Skip to the main content

Original scientific paper

IMPROVMENT OF THE MINING METHOD IN THE BAUXITE MINE ĆUKOVAC-GRIŽINICA

Borislav Perić
Slavko Vujec


Full text: croatian pdf 1.493 Kb

page 111-117

downloads: 891

cite


Abstract

Exploitation of bauxite in region of Dalmatia has tradition of more than 50 years. The biggest underground mine of this bauxite hearing area was developed in deposit Ćukovac-Grižinica with proved workable reserves of 1.2 x 106 t. Yearly output in 1990. was 100.000 t. Production in this mine started 1987, and sublevel caving method was used. Coefficient of extraction in the parts with weak rocks is low, and unsufficient security in the conditions with firm roof. Therefore investigation of improvement of mining method was carrying on to coinside characteristics of rocks, and mining methods. Following methods were selected: sublevel caving (actually retreat stoping), sublevel sloping and sublevel caving with bauxite protection layer.

Keywords

Bauxite; Underground bauxite exploitation; Excavation methods; Improvement of excavation methods

Hrčak ID:

24752

URI

https://hrcak.srce.hr/24752

Publication date:

4.12.1992.

Article data in other languages: croatian

Visits: 1.801 *