Skip to the main content

Original scientific paper

https://doi.org/10.17559/TV-20220708091029

Optimal PMU Placement for Türkiye 400 kV Interconnected Power System Observability with Dragonfly Algorithm

Beytullah Bozali ; Duzce Vocational School, Department of Electricity and Energy, Uzunmustafa neighborhood, Uzunmustafa Street No: 23, Türkiye
Ali Oztürk ; Faculty of Engineering, Department of Electric and Electronic Engineering, Duzce University, Konuralp Campus, 81620, Türkiye
Salih Tosun ; Faculty of Engineering, Department of Electric and Electronic Engineering, Duzce University, Konuralp Campus, 81620, Türkiye
Bülent Hoş ; Electric, and Electronic Engineering USA, Graduate Institute of Education, Duzce University, Konuralp Campus, 81620, Türkiye


Full text: english pdf 1.247 Kb

page 733-741

downloads: 332

cite


Abstract

The Phasor Measurement Unit (PMU) is a modern measuring device built on the system for monitoring, controlling, and protecting power systems. Since the costs of PMU devices are very high, they must be placed in the system in optimum numbers and in a way that monitors the whole system. This study determined the locations and numbers of the optimal number of PMU devices that can monitor the whole system. Integer Linear Programming (ILP) and Binary Particle Swarm Optimization (BPSO) methods are proposed to solve the optimum PMU placement (OPP) problem. Then, the solution to the problem is carried out using Dragonfly Algorithm (DA), which is proposed as a new heuristic method. Solution methods were applied to the IEEE 14-Bus Test System and Türkiye 400 kV Interconnected Power System, and the results were compared. In addition, the results of the proposed methods were compared with the results of different studies in the literature. Thanks to the ILP, BPSO, and DA methods proposed in this study, it has been determined that power systems can be observed with fewer PMU devices. The DA method offers a great cost advantage as it is the method that provides a solution with 5 fewer PMU devices for the 400 kV Interconnected Power System in Türkiye.

Keywords

dragonfly algorithm (DA); integer linear programming (ILP); optimal PMU placement (OPP); observability; PMU