Skip to the main content

Original scientific paper

https://doi.org/10.17559/TV-20230209000341

A Decision Method for the Catchment Area of Subway Station Under the Difference of Connection Modes

Zhaohua Wang ; School of Mechanical and Electrical engineering, Beijing Institute of Graphic Communication, No.1, Xinghua Street, 102699 Daxing District, Beijing, P. R. China
Xin Zhu ; Management School, Beijing Union University, No.97, East North Fourth Ring Road, 100101 Chaoyang District, Beijing, P. R. China
Yanping Du ; School of Mechanical and Electrical engineering, Beijing Institute of Graphic Communication, No.1, Xinghua Street, 102699 Daxing District, Beijing, P. R. China
Shuihai Dou ; School of Mechanical and Electrical engineering, Beijing Institute of Graphic Communication, No.1, Xinghua Street, 102699 Daxing District, Beijing, P. R. China


Full text: english pdf 2.348 Kb

page 372-382

downloads: 53

cite


Abstract

There is an interaction between subway station and the catchment area around the station, the catchment area of subway station on surrounding land is closely related to the connection modes. At present, subway passengers mainly reach subway stations by walking, cycling and bus, and the catchment area of the three connection modes is different. In order to clarify the catchment area of subway stations, it is necessary to study the catchment area of the three connection modes of subway stations. This study starts with a generalized connection cost for each connection mode, constructing the generalized connection cost models, especially considering the psychological changes of passengers with the increase of connecting distance. On this basis, we use Logit-SUE model to construct the probability density curve of the superior connection distance of different connection modes in different types and different area subway stations. Taking Beijing Metro Line 4 as the research case, through analyzing the probability density curve of each station of Line 4 we calculate the advantageous connection range of each subway station with different connection modes, and take the advantageous connection range as the catchment area for each type of connection mode.

Keywords

catchment; generalized connection cost; logit-SUE, subway connection

Hrčak ID:

314825

URI

https://hrcak.srce.hr/314825

Publication date:

29.2.2024.

Visits: 121 *