Skip to the main content

Preliminary communication

A PHOTOVOLTAIC PARK’S PERFORMANCE ON THE ISLAND OF CRETE

Emmanuel Kymakis ; Technological Educational Institute of Crete, Heraclion, Crete, Greece
Sofoklis Kalykakis ; Technological Educational Institute of Crete, Heraclion, Crete, Greece
Thales M. Papazoglou ; Technological Educational Institute of Crete, Heraclion, Crete, Greece


Full text: croatian pdf 801 Kb

page 300-311

downloads: 558

cite

Full text: english pdf 801 Kb

page 300-311

downloads: 913

cite


Abstract

The favorable climate conditions of the island of Crete and the recent legislation for the utilization of renewable energy sources, provide a substantial incentive for the installation of photovoltaic power plants. In this paper, the grid-connected photovoltaic park (PV park) of C. Rokas SA in Sitia, Crete is presented and its performance is evaluated. The photovoltaic park has a peak power of 170 kWp, and has been in operation since 2002. The park is suitably monitored for a one year internal and the performance ratio and the various power losses (temperature, soiling, internal network, power electronics, grid availability & interconnection) are calculated. The PV Park supplied 230 MWh to the grid during 2007, ranging from 335 kWh to 870 kWh per day. The final yield (YF) ranged from 2 h/d to 5 h/d and the performance ratio (PR) ranged from 58 % to 73 %, giving an annual PR of 67,36 %.

Keywords

capacity factor; energy output; final yield; peak power; performance ratio; photovoltaic park; power losses; reference yield

Hrčak ID:

28983

URI

https://hrcak.srce.hr/28983

Publication date:

30.6.2008.

Article data in other languages: croatian

Visits: 2.748 *