Skip to the main content

Professional paper

Methodological approach to the calculation of machine work cost in civil engineering

Stjepan Bezak
Zdravko Linarić


Full text: croatian pdf 121 Kb

page 23-27

downloads: 3.690

cite


Abstract

In introduction, it is claimed that the choice of machinery, and the mechanical work planning, are of high significance when defining approach to construction work. A methodological approach for calculating the hourly rate of earth-moving machines in construction industry is described. The methodology is especially well suited for analysis of mechanical work in the construction of water management facilities. The calculation is related to earth works. The results obtained in the use of this methodology have been statistically analysed and compared with the results based on the existing methodologies.

Keywords

construction machine; machine work; earth works; machine hourly rate; water management facilities; methodology

Hrčak ID:

35513

URI

https://hrcak.srce.hr/35513

Publication date:

19.3.2009.

Article data in other languages: croatian

Visits: 5.053 *