Skip to the main content

Professional paper

Selection of machines for excavation of water main trenches

Slaven Cukrov


Full text: croatian pdf 458 Kb

page 339-345

downloads: 3.515

cite


Abstract

The process aimed at selecting machines for excavation of water main trenches, as conducted during bidding for the first-stage construction work on the regional water mains between Vrpolje and Vučevica, is described in the paper. Basic technical data about the facility, geological-geotechnical soil characteristics, on-site conditions, and requirements set in bidding documents, are presented. The selection of trenching machines is presented separately, and specific features of the works are given. It is reported that the main pipeline will be realized in three phases.

Keywords

pipeline; pipeline trenches; trench excavation; construction machines; Vrpolje - Vučevica pipeline; phase

Hrčak ID:

38467

URI

https://hrcak.srce.hr/38467

Publication date:

18.5.2009.

Article data in other languages: croatian

Visits: 4.633 *