Skip to the main content

Preliminary communication

Construction time overrun as a function of risk factors

Vahida Žujo
Diana Car-Pušić


Full text: croatian pdf 153 Kb

page 721-729

downloads: 623

cite


Abstract

The analysis of overrun of contract-based construction times, as triggered by risk factors, is presented in the paper. The principal objective is to determine a model, as realistic as possible, for rapid estimation of construction time. Based on data from the total of 53 building construction projects realized in the Federation of Bosnia & Herzegovina, appropriate models were established for two building types, i.e. new construction and rehabilitation of existing facilities. These models can be applied in situations where the occurrence and activation of risk factors can realistically be expected.

Keywords

construction time; construction model; new construction; rehabilitation; risk factors; construction time estimation

Hrčak ID:

41013

URI

https://hrcak.srce.hr/41013

Publication date:

14.9.2009.

Article data in other languages: croatian

Visits: 1.626 *