Skoči na glavni sadržaj

Izvorni znanstveni članak

https://doi.org/10.5592/otmcj.2013.1.5

Contruction waste generation across construction project life-cycle

Mária Kozlovská
Marcela Spišáková


Puni tekst: engleski pdf 1.136 Kb

str. 687-695

preuzimanja: 5.474

citiraj


Sažetak

The construction and demolition waste (CDW), which is produced by the construction process, presents 33% of the total waste stream in European Union in year 2010 (Eurostat 2010). A construction and demolition waste is generated during whole life cycle of construction - design phase, realization phase, occupation phase and demolition phase. On the other hand, the sustainable design of construction in the design phase presents possibility for the significantly reduce a
volume of generated construction waste. In this phase, we are
able to identify and quantify the volume and sort of construction
waste. Based on this information, it is possible to determine the
possibilities of construction waste disposal and the costs for its
treatment.
This paper deals with proposal of options to reduce construction and demolition waste in the design phase as well as in
the realization phase of constructions. The first part of paper
describes possibilities of modern methods of construction use
in the design phase of construction. The second part of paper
describes the opportunities of cost reduction for the construction ways disposal. There are also analysed the foreign studies focused on the quantification of construction waste generation in the design and realization phase because the waste quantification provides a necessary tool for evaluating the true size of the wastes and hence making the adequate decisions for their minimization and sustainable management. The conclusion of paper involves a proposal of cost prediction for construction waste disposal through the most widely used of Slovak construction-economic software Cenkros Plus.

Ključne riječi

Construction; Life cycle of construction; Construction and demolition waste (CDW); Waste disposal; Quantification of construction and demolition waste; Modern methods of construction (MMC)

Hrčak ID:

105232

URI

https://hrcak.srce.hr/105232

Datum izdavanja:

8.7.2013.

Posjeta: 7.028 *