Energija, Vol. 65 No. 3-4, 2016.
Izvorni znanstveni članak
Application of Best Estimate Plus Uncertainty (BEPU) Methodology in a Final Safety Analysis Report (FSAR) of a Generic Plant
Francine Menzel
; Instituto de Pesquisas Energéticas e Nucleares – IPEN/CNEN-SP Avenida Lineu Prestes 2242, São Paulo, Brazil
Gaianê Sabundjian
; Instituto de Pesquisas Energéticas e Nucleares – IPEN/CNEN-SP Avenida Lineu Prestes 2242, São Paulo, Brazil
Francesco D’Auria
; Università degli Studi di Pisa Gruppo di Ricerca Nucleare San Piero a Grado - GRNSPG San Piero a Grado, Pisa, Italy
Alzira A. Madeira
; Comissão Nacional de Energia Nuclear - CNEN Rua General Severiano, 90, Rio de Janeiro, Brazil
Sažetak
The licensing process of a nuclear power plant is motivated by the need to protect humans and
the environment from ionizing radiation and, at the same time, sets out the basis for the design and
determining the acceptability of the plant. An important part of the licensing process is the
realization of accident analysis related to the design basis, which should be documented in the Final
Safety Analysis Report (FSAR). There are different options on accidents calculation area by
combining the use of computer codes and data entry for licensing purposes. One is the Best
Estimate Plus Uncertainty (BEPU), which considers realistic input data and associated
uncertainties. Applications of BEPU approaches in licensing procedures were initiated in the 2000s,
first to analysis of Loss of Coolant Accident (LOCA), and then to the accident analysis as a whole,
documented in Chapter 15 of the FSAR. This work has as main objective the implementation of
BEPU methodology in all analyses contained in FSAR, through the homogenization of the
analytical techniques and identification of key disciplines and key topics in the licensing process.
Ključne riječi
Licensing; Nuclear Power Plants; Safety Analysis; Final Safety Analysis Report; BEPU