Izlaganje sa skupa
DISCUSSION ON THE NECESSITY OF BIM AND PREFABRICATED BUILDING WHOLE PROJECT COOPERATION FROM THE PERSPECTIVE OF ADAPTIVE PSYCHOLOGY
Xiaoli Sun
Puni tekst: engleski pdf 159 Kb
str. 497-498
preuzimanja: 124
citiraj
APA 6th Edition
Sun, X. (2021). DISCUSSION ON THE NECESSITY OF BIM AND PREFABRICATED BUILDING WHOLE PROJECT COOPERATION FROM THE PERSPECTIVE OF ADAPTIVE PSYCHOLOGY. Psychiatria Danubina, 33 (suppl 8), 497-498. Preuzeto s https://hrcak.srce.hr/269020
MLA 8th Edition
Sun, Xiaoli. "DISCUSSION ON THE NECESSITY OF BIM AND PREFABRICATED BUILDING WHOLE PROJECT COOPERATION FROM THE PERSPECTIVE OF ADAPTIVE PSYCHOLOGY." Psychiatria Danubina, vol. 33, br. suppl 8, 2021, str. 497-498. https://hrcak.srce.hr/269020. Citirano 23.12.2024.
Chicago 17th Edition
Sun, Xiaoli. "DISCUSSION ON THE NECESSITY OF BIM AND PREFABRICATED BUILDING WHOLE PROJECT COOPERATION FROM THE PERSPECTIVE OF ADAPTIVE PSYCHOLOGY." Psychiatria Danubina 33, br. suppl 8 (2021): 497-498. https://hrcak.srce.hr/269020
Harvard
Sun, X. (2021). 'DISCUSSION ON THE NECESSITY OF BIM AND PREFABRICATED BUILDING WHOLE PROJECT COOPERATION FROM THE PERSPECTIVE OF ADAPTIVE PSYCHOLOGY', Psychiatria Danubina, 33(suppl 8), str. 497-498. Preuzeto s: https://hrcak.srce.hr/269020 (Datum pristupa: 23.12.2024.)
Vancouver
Sun X. DISCUSSION ON THE NECESSITY OF BIM AND PREFABRICATED BUILDING WHOLE PROJECT COOPERATION FROM THE PERSPECTIVE OF ADAPTIVE PSYCHOLOGY. Psychiatria Danubina [Internet]. 2021 [pristupljeno 23.12.2024.];33(suppl 8):497-498. Dostupno na: https://hrcak.srce.hr/269020
IEEE
X. Sun, "DISCUSSION ON THE NECESSITY OF BIM AND PREFABRICATED BUILDING WHOLE PROJECT COOPERATION FROM THE PERSPECTIVE OF ADAPTIVE PSYCHOLOGY", Psychiatria Danubina, vol.33, br. suppl 8, str. 497-498, 2021. [Online]. Dostupno na: https://hrcak.srce.hr/269020. [Citirano: 23.12.2024.]
Sažetak
Ključne riječi
Hrčak ID:
269020
URI
https://hrcak.srce.hr/269020
Datum izdavanja:
22.12.2021.
Posjeta: 312
*