IGWO-SVM: An Enhanced Cost Prediction Model for Construction Projects

DaWen Zhang ; School of Civil Engineering, Southwest Jiaotong University Hope College, ChengDu, SiChuan, China, 610400 *

* Dopisni autor.


Puni tekst: engleski pdf 1.398 Kb

str. 1347-1357

preuzimanja: 443

citiraj


Sažetak

Accurate cost prediction is crucial for successful construction project management. This study proposes an improved Grey Wolf Optimizer-Support Vector Machine (IGWO-SVM) model for construction project cost prediction. The model incorporates Tent mapping and quantum well techniques to enhance the global search capability and prediction accuracy. Experimental results show that the IGWO-SVM model achieves a prediction error rate of 0.01%, significantly outperforming traditional methods. The model reduced total construction days by 1.72%, total cost by 1.89%, and improved quality levels by 15.31% on average. The IGWO-SVM model demonstrates high stability and accuracy, providing a reliable tool for construction project cost prediction and optimization.

Ključne riječi

construction project; cost prediction; cost optimization; grey wolf optimizer; support vector machine