hrcak mascot   Srce   HID

Stručni rad

A Continuous Process Improvement Application in Shipbuilding

Murat OZKOK ; Department of Naval Architecture and Marine Engineering, Karadeniz Technical University, 61530 Camburnu/Trabzon/Turkey
I. Hakki HELVACIOGLU ; Faculty of Naval Architecture and Ocean Engineering, Istanbul Technical University, 34469, Maslak/Istanbul, Turkey

Puni tekst: engleski, pdf (274 KB) str. 31-39 preuzimanja: 1.012* citiraj
APA 6th Edition
OZKOK, M. i HELVACIOGLU, I.H. (2013). A Continuous Process Improvement Application in Shipbuilding. Brodogradnja, 64 (1), 31-39. Preuzeto s https://hrcak.srce.hr/99874
MLA 8th Edition
OZKOK, Murat i I. Hakki HELVACIOGLU. "A Continuous Process Improvement Application in Shipbuilding." Brodogradnja, vol. 64, br. 1, 2013, str. 31-39. https://hrcak.srce.hr/99874. Citirano 15.10.2021.
Chicago 17th Edition
OZKOK, Murat i I. Hakki HELVACIOGLU. "A Continuous Process Improvement Application in Shipbuilding." Brodogradnja 64, br. 1 (2013): 31-39. https://hrcak.srce.hr/99874
Harvard
OZKOK, M., i HELVACIOGLU, I.H. (2013). 'A Continuous Process Improvement Application in Shipbuilding', Brodogradnja, 64(1), str. 31-39. Preuzeto s: https://hrcak.srce.hr/99874 (Datum pristupa: 15.10.2021.)
Vancouver
OZKOK M, HELVACIOGLU IH. A Continuous Process Improvement Application in Shipbuilding. Brodogradnja [Internet]. 2013 [pristupljeno 15.10.2021.];64(1):31-39. Dostupno na: https://hrcak.srce.hr/99874
IEEE
M. OZKOK i I.H. HELVACIOGLU, "A Continuous Process Improvement Application in Shipbuilding", Brodogradnja, vol.64, br. 1, str. 31-39, 2013. [Online]. Dostupno na: https://hrcak.srce.hr/99874. [Citirano: 15.10.2021.]

Sažetak
There is hard competitive environment in production industry and shipyards have a lot of competitors. Under these circumstances, the process improvement operations are very signifi cant in shipbuilding industry. In recent years, shipyards have been attempting to improve their processes by investigating their current production system so that they can keep their competitive power in global extent. Shipyards seek to decrease the cycle time of the interim products in order to
increase the annual production capacity and the market share of the shipyard. In order to do this, shipyards have to analyze their own production system and perform some improvements on the
current production system. In this study, the process improvement model is presented. The process improvement model consists of the continuous improvement method, OPT (Optimized Production
Technology), and simulation. The phases in the model were implemented for a double bottom block of a container ship. As a result, by doing some improvements on the current production system,
the cycle time of the double bottom block was shortened. The rate of the improvement of the cycle time is about 100% in theory. The results of the study are discussed in the fi nal section.

Ključne riječi
continuous improvement; OPT, shipbuilding; shipyard; ship production, simulation

Hrčak ID: 99874

URI
https://hrcak.srce.hr/99874

Posjeta: 1.391 *