hrcak mascot   Srce   HID

Pregledni rad
https://doi.org/10.17559/TV-20170319011033

Analiza zelene ekološke procjene brzovozeće željeznice primjenom neutvrđene mjere i AHP

Yongzhi Chang ; Institute of Geographic Sciences and Natural Resources Research the Chinese Academy of Sciences, Jia 11#, Datun Road, Chaoyang District, Beijing 100101, China
Suocheng Dong ; Institute of Geographic Sciences and Natural Resources Research the Chinese Academy of Sciences, Jia 11#, Datun Road, Chaoyang District, Beijing 100101, China

Puni tekst: hrvatski, pdf (2 MB) str. 1579-1589 preuzimanja: 151* citiraj
APA 6th Edition
Chang, Y. i Dong, S. (2017). Analiza zelene ekološke procjene brzovozeće željeznice primjenom neutvrđene mjere i AHP. Tehnički vjesnik, 24 (5), 1579-1589. https://doi.org/10.17559/TV-20170319011033
MLA 8th Edition
Chang, Yongzhi i Suocheng Dong. "Analiza zelene ekološke procjene brzovozeće željeznice primjenom neutvrđene mjere i AHP." Tehnički vjesnik, vol. 24, br. 5, 2017, str. 1579-1589. https://doi.org/10.17559/TV-20170319011033. Citirano 24.01.2020.
Chicago 17th Edition
Chang, Yongzhi i Suocheng Dong. "Analiza zelene ekološke procjene brzovozeće željeznice primjenom neutvrđene mjere i AHP." Tehnički vjesnik 24, br. 5 (2017): 1579-1589. https://doi.org/10.17559/TV-20170319011033
Harvard
Chang, Y., i Dong, S. (2017). 'Analiza zelene ekološke procjene brzovozeće željeznice primjenom neutvrđene mjere i AHP', Tehnički vjesnik, 24(5), str. 1579-1589. https://doi.org/10.17559/TV-20170319011033
Vancouver
Chang Y, Dong S. Analiza zelene ekološke procjene brzovozeće željeznice primjenom neutvrđene mjere i AHP. Tehnički vjesnik [Internet]. 2017 [pristupljeno 24.01.2020.];24(5):1579-1589. https://doi.org/10.17559/TV-20170319011033
IEEE
Y. Chang i S. Dong, "Analiza zelene ekološke procjene brzovozeće željeznice primjenom neutvrđene mjere i AHP", Tehnički vjesnik, vol.24, br. 5, str. 1579-1589, 2017. [Online]. https://doi.org/10.17559/TV-20170319011033
Puni tekst: engleski, pdf (2 MB) str. 1579-1589 preuzimanja: 132* citiraj
APA 6th Edition
Chang, Y. i Dong, S. (2017). Study on green ecological assessment of high-speed railway using unascertained measure and AHP. Tehnički vjesnik, 24 (5), 1579-1589. https://doi.org/10.17559/TV-20170319011033
MLA 8th Edition
Chang, Yongzhi i Suocheng Dong. "Study on green ecological assessment of high-speed railway using unascertained measure and AHP." Tehnički vjesnik, vol. 24, br. 5, 2017, str. 1579-1589. https://doi.org/10.17559/TV-20170319011033. Citirano 24.01.2020.
Chicago 17th Edition
Chang, Yongzhi i Suocheng Dong. "Study on green ecological assessment of high-speed railway using unascertained measure and AHP." Tehnički vjesnik 24, br. 5 (2017): 1579-1589. https://doi.org/10.17559/TV-20170319011033
Harvard
Chang, Y., i Dong, S. (2017). 'Study on green ecological assessment of high-speed railway using unascertained measure and AHP', Tehnički vjesnik, 24(5), str. 1579-1589. https://doi.org/10.17559/TV-20170319011033
Vancouver
Chang Y, Dong S. Study on green ecological assessment of high-speed railway using unascertained measure and AHP. Tehnički vjesnik [Internet]. 2017 [pristupljeno 24.01.2020.];24(5):1579-1589. https://doi.org/10.17559/TV-20170319011033
IEEE
Y. Chang i S. Dong, "Study on green ecological assessment of high-speed railway using unascertained measure and AHP", Tehnički vjesnik, vol.24, br. 5, str. 1579-1589, 2017. [Online]. https://doi.org/10.17559/TV-20170319011033

Sažetak
U svrhu istraživanja ekološkog učinka konstrukcije i funkcioniranja brzovozeće željeznice, u radu se postavlja sustav određivanja indeksa zelene ekološke procjene na temelju koncepta održivog razvoja te se postavlja model ekološke procjene na osnovu neutvrđene mjere i AHP. U tom postupku autor najprije konstruira matricu neutvrđene procjene uvodeći neutvrđenu teoriju, zatim određuje težinu indeksa klasifikacije primjenom AHP, a kao treće određuje ekološki stupanj u skladu s kriterijem povjerenja. Na toj osnovi autor definira stupnjeve ekološke procjene. Zatim autor daje zelenu ekološku procjenu za željeznicu Beijing-Shanghai (dio Xuzhou-Shanghai). Ekološki omjer je 7.0089 a rezultirajuća boja je tirkizna, što je u skladu s konceptom održivog razvoja. Rezultat pokazuje da je izvodivo kombinirati neutvrđenu mjeru i AHP u metodi ekološke procjene za projekt izgradnje brzovozeće željeznice.

Ključne riječi
AHP; neutvrđena mjera; održivi razvoj; projekt izgradnje brzovozeće željeznice; zelena ekologija

Hrčak ID: 188256

URI
https://hrcak.srce.hr/188256

[engleski]

Posjeta: 443 *