THE OPTIMIZATION OF TIME AND COST PROCESS TECHNIQUE

Dražen Barković ; Josip Juraj Strossmayer University of Osijek, Faculty of Economics in Osijek, Osijek, Croatia
Josip Jukić ; College of Slavonski Brod, Slavonski Brod, Croatia

Puni tekst: engleski, PDF (418 KB) str. 287-300 preuzimanja: 250* citiraj
APA 6th Edition
Barković, D. i Jukić, J. (2017). THE OPTIMIZATION OF TIME AND COST PROCESS TECHNIQUE. Ekonomski vjesnik, 30 (2), 287-300. Preuzeto s https://hrcak.srce.hr/191896
MLA 8th Edition
Barković, Dražen i Josip Jukić. "THE OPTIMIZATION OF TIME AND COST PROCESS TECHNIQUE." Ekonomski vjesnik, vol. 30, br. 2, 2017, str. 287-300. https://hrcak.srce.hr/191896. Citirano 27.09.2020.
Chicago 17th Edition
Barković, Dražen i Josip Jukić. "THE OPTIMIZATION OF TIME AND COST PROCESS TECHNIQUE." Ekonomski vjesnik 30, br. 2 (2017): 287-300. https://hrcak.srce.hr/191896
Harvard
Barković, D., i Jukić, J. (2017). 'THE OPTIMIZATION OF TIME AND COST PROCESS TECHNIQUE', Ekonomski vjesnik, 30(2), str. 287-300. Preuzeto s: https://hrcak.srce.hr/191896 (Datum pristupa: 27.09.2020.)
Vancouver
Barković D, Jukić J. THE OPTIMIZATION OF TIME AND COST PROCESS TECHNIQUE. Ekonomski vjesnik [Internet]. 2017 [pristupljeno 27.09.2020.];30(2):287-300. Dostupno na: https://hrcak.srce.hr/191896
IEEE
D. Barković i J. Jukić, "THE OPTIMIZATION OF TIME AND COST PROCESS TECHNIQUE", Ekonomski vjesnik, vol.30, br. 2, str. 287-300, 2017. [Online]. Dostupno na: https://hrcak.srce.hr/191896. [Citirano: 27.09.2020.]

Sažetak
The critical path method (CPM) and linear programming are two closely related operations research techniques. Some of their concepts are presented in this paper in order to review some recent modelling structures that have been particularly valuable in the analysis of project time-cost crashes problems.

The activities underwent crashing of both the time and cost using linear programming. A simplified representation of a small project and a linear programming model were formulated to represent this system. In addition to being simple, the advantage of this method is that it is applicable to large networks. It allows for a shorter computational time at a lower cost, whereas robustness is increased.

Ključne riječi
critical path method; linear programming; time crashing; maintenance