hrcak mascot   Srce   HID

Izvorni znanstveni članak
https://doi.org/10.21278/TOF.44107

Integrated Production and Maintenance Planning for Flow Line Systems

Wenwen Lin ; Faculty of Mechanical Engineering & Mechanics, Ningbo University, Ningbo Zhejiang China, Part Rolling Key Laboratory of Zhejiang Province, Ningbo University, Ningbo Zhejiang, China
Yuejun Zhang ; Faculty of Mechanical Engineering & Mechanics, Ningbo University, Ningbo Zhejiang China

Puni tekst: engleski, pdf (556 KB) str. 79-91 preuzimanja: 120* citiraj
APA 6th Edition
Lin, W. i Zhang, Y. (2020). Integrated Production and Maintenance Planning for Flow Line Systems. Transactions of FAMENA, 44 (1), 79-91. https://doi.org/10.21278/TOF.44107
MLA 8th Edition
Lin, Wenwen i Yuejun Zhang. "Integrated Production and Maintenance Planning for Flow Line Systems." Transactions of FAMENA, vol. 44, br. 1, 2020, str. 79-91. https://doi.org/10.21278/TOF.44107. Citirano 30.11.2020.
Chicago 17th Edition
Lin, Wenwen i Yuejun Zhang. "Integrated Production and Maintenance Planning for Flow Line Systems." Transactions of FAMENA 44, br. 1 (2020): 79-91. https://doi.org/10.21278/TOF.44107
Harvard
Lin, W., i Zhang, Y. (2020). 'Integrated Production and Maintenance Planning for Flow Line Systems', Transactions of FAMENA, 44(1), str. 79-91. https://doi.org/10.21278/TOF.44107
Vancouver
Lin W, Zhang Y. Integrated Production and Maintenance Planning for Flow Line Systems. Transactions of FAMENA [Internet]. 2020 [pristupljeno 30.11.2020.];44(1):79-91. https://doi.org/10.21278/TOF.44107
IEEE
W. Lin i Y. Zhang, "Integrated Production and Maintenance Planning for Flow Line Systems", Transactions of FAMENA, vol.44, br. 1, str. 79-91, 2020. [Online]. https://doi.org/10.21278/TOF.44107

Sažetak
This study extends the investigation of the capacitated lot-sizing problem to the production and maintenance planning in unreliable flow line systems. An integrated modelling framework is proposed with the aim of seeking a cost-optimal plan for both production and maintenance. In the model, preventive maintenance is scheduled to avoid unplanned failures, and corrective maintenance is carried out in any machine in which an unplanned failure occurs. A regression-based approximation approach was introduced to calculate the production time under random failures. Then, the integrated planning model can be solved by any commercial optimization software. The numerical example demonstrates that the integrated model guarantees the effectiveness of the production and maintenance plan. It also showed that the buffer capacity has significant effects on the capacity utilization.

Ključne riječi
production planning; maintenance; flow line system; simulation; polynomial regression

Hrčak ID: 237744

URI
https://hrcak.srce.hr/237744

Posjeta: 226 *