Skoči na glavni sadržaj

Izvorni znanstveni članak

Generation of Optimal Vessel’s Production Cost Structure

Nikša FAFANDJEL orcid id orcid.org/0000-0002-6564-1621 ; Tehnički fakultet Sveučilišta u Rijeci,Rijeka,Hrvatska
Albert ZAMARIN ; Tehnički fakultet Sveučilišta u Rijeci,Rijeka,Hrvatska
Marko HADJINA ; Tehnički fakultet Sveučilišta u Rijeci,Rijeka,Hrvatska


Puni tekst: engleski pdf 2.627 Kb

str. 77-84

preuzimanja: 2.078

citiraj


Sažetak

Establishing ship newbuilding production costs structure represents a fundamental management activity, concerning materials and fabrication in shipbuilding. Shipyards are competing in world market niches, regarding vessel types and dimensions. Therefore, a vessel’s market price has a tremendous influence at shipyard’s determination of vessel price offered to buyers. For this reason shipyard management is forced to concentrate its effort to act upon new building production costs structure optimisation as to achieve the goal of profitable shipyard enterprise. In this paper a computer integrated mathematical model of engineering cost of vessel production generated by authors is presented. Proposed cost structure configuration is based on both functional and technological vessel breakdown structures. Statistical analysis of data was performed for a sample of tankers population, built in Croatian shipyards. Probabilistic theory was applied and several results such as the expected values for aggregate figures are presented. Such developed tool for obtaining an optimal production costs structure enables shipyard management besides more successful managing and decision making, also latter, through the process a better costs control within model parameters. Dynamic control is needed of costing figures within optimised structure of production costs that for assigned conditions, for the whole shipbuilding process and product, have significant influence upon performance final results. Mathematical model for achieving optimal structure of production costs was verified and tested against real sample of new tankers built, not previously included in cost structure generation.

Ključne riječi

Production costs analysis; Ship building industry; Stochastic processes

Hrčak ID:

40608

URI

https://hrcak.srce.hr/40608

Datum izdavanja:

30.4.2008.

Posjeta: 2.660 *