Sensitivity analysis of facilities life cycle costs

Saša Marenjak ; Građevinski fakultet u Osijeku, Sveučilište Josipa Jurja Strossmayera, Crkvena ulica 21, 31000 Osijek, Croatia
Hrvoje Krstić   ORCID icon orcid.org/0000-0001-5118-4186 ; Građevinski fakultet u Osijeku, Sveučilište Josipa Jurja Strossmayera, Crkvena ulica 21, 31000 Osijek, Croatia

Puni tekst: engleski, pdf (255 KB) str. 481-487 preuzimanja: 2.025* citiraj
APA 6th Edition
Marenjak, S. i Krstić, H. (2010). Sensitivity analysis of facilities life cycle costs. Tehnički vjesnik, 17 (4), 481-487. Preuzeto s https://hrcak.srce.hr/62923
MLA 8th Edition
Marenjak, Saša i Hrvoje Krstić. "Sensitivity analysis of facilities life cycle costs." Tehnički vjesnik, vol. 17, br. 4, 2010, str. 481-487. https://hrcak.srce.hr/62923. Citirano 20.09.2020.
Chicago 17th Edition
Marenjak, Saša i Hrvoje Krstić. "Sensitivity analysis of facilities life cycle costs." Tehnički vjesnik 17, br. 4 (2010): 481-487. https://hrcak.srce.hr/62923
Harvard
Marenjak, S., i Krstić, H. (2010). 'Sensitivity analysis of facilities life cycle costs', Tehnički vjesnik, 17(4), str. 481-487. Preuzeto s: https://hrcak.srce.hr/62923 (Datum pristupa: 20.09.2020.)
Vancouver
Marenjak S, Krstić H. Sensitivity analysis of facilities life cycle costs. Tehnički vjesnik [Internet]. 2010 [pristupljeno 20.09.2020.];17(4):481-487. Dostupno na: https://hrcak.srce.hr/62923
IEEE
S. Marenjak i H. Krstić, "Sensitivity analysis of facilities life cycle costs", Tehnički vjesnik, vol.17, br. 4, str. 481-487, 2010. [Online]. Dostupno na: https://hrcak.srce.hr/62923. [Citirano: 20.09.2020.]

Sažetak
Life cycle cost analysis of the constructed facilities provides insight into the planning, design, construction, operation, maintenance and disposal costs of the facilities. By applying this method during the early design phase it is possible to reduce maintenance and operating costs, plan future costs of ownership and prevent or reduce the impact of business interruption due to the maintenance and functional usability. The results of the life cycle cost analysis of facilities depend considerably on the period of life cycle cost analysis and the applied discount rate once net present values are populated. This paper presents life cycle costs case study analysis of the public facility for two different analysis periods, one of 30 and another of 50 years. Facility life cycle costs for both analyzed periods have been discounted to net present value using five different discount rate factors. Predicted construction costs are calculated based on Croatian construction standards, and operation and maintenance costs are based on analysis of historical data of similar constructed facilities in Croatia.

Ključne riječi
facility management; facilities life cycle costs; sensitivity analysis