HULL’S MANUFACTURING COST STRUCTURE

Miguel Leal ; One Ocean, Portugal
José Manuel Gordo   ORCID icon orcid.org/0000-0002-0402-0776 ; CENTEC, IST, University of Lisbon

Puni tekst: engleski, pdf (1 MB) str. 1-24 preuzimanja: 2.093* citiraj
APA 6th Edition
Leal, M. i Gordo, J.M. (2017). HULL’S MANUFACTURING COST STRUCTURE. Brodogradnja, 68 (3), 1-24. https://doi.org/10.21278/brod68301
MLA 8th Edition
Leal, Miguel i José Manuel Gordo. "HULL’S MANUFACTURING COST STRUCTURE." Brodogradnja, vol. 68, br. 3, 2017, str. 1-24. https://doi.org/10.21278/brod68301. Citirano 28.11.2021.
Chicago 17th Edition
Leal, Miguel i José Manuel Gordo. "HULL’S MANUFACTURING COST STRUCTURE." Brodogradnja 68, br. 3 (2017): 1-24. https://doi.org/10.21278/brod68301
Harvard
Leal, M., i Gordo, J.M. (2017). 'HULL’S MANUFACTURING COST STRUCTURE', Brodogradnja, 68(3), str. 1-24. https://doi.org/10.21278/brod68301
Vancouver
Leal M, Gordo JM. HULL’S MANUFACTURING COST STRUCTURE. Brodogradnja [Internet]. 2017 [pristupljeno 28.11.2021.];68(3):1-24. https://doi.org/10.21278/brod68301
IEEE
M. Leal i J.M. Gordo, "HULL’S MANUFACTURING COST STRUCTURE", Brodogradnja, vol.68, br. 3, str. 1-24, 2017. [Online]. https://doi.org/10.21278/brod68301

Sažetak
This study analyses the structure of costs of several processes associated with the shipbuilding industry. The analysed productive processes are: cutting preparation procedures, steel plate cutting processes, processes of hull plates and stiffeners forming, associated transportation and assembling of plates and profiles, and finally the welding processes.
The methodology allows a shipyard to identify the main costs related to the manufacturing of the hull and the aspects that should be improved for increase productivity.
The methodology adopted may easily be adapted by each shipyard creating a work database in order to improve and update these formulas by adding new corrective coefficients based on the type of the built ship or construction complexity of certain ship blocks.
It is analysed 2 independent case studies that took place at different Portuguese shipyards and covering different aspects of the steel hull shipbuilding processes.
The first case study considers time and cost analysis of cutting preparation processes made by the design office, cutting/marking of steel plates and forming processes of stiffeners and hull plates, required for the construction of an 83m Hopper Barge, built by MPG, at LISNAVE Mitrena Shipyard, Portugal, 2010.
The second case considers the time and cost analysis of stiffeners cutting, steel plates and stiffeners assembly and welding, associated with the building of several blocks of an 80m fisheries supporting vessel by JOPERINOX Shipyard at Alverca, Portugal, 2008.

Ključne riječi
Ship Construction; Budget breakdown; Cutting; Welding; Transport; Bending; Forming; Preparation; Time and Cost Analysis